<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02858nam a22001577a 4500</leader>
  <controlfield tag="003">OSt</controlfield>
  <controlfield tag="005">20251023121111.0</controlfield>
  <controlfield tag="008">251023b        |||||||| |||| 00| 0 eng d</controlfield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="c">Kepler College</subfield>
  </datafield>
  <datafield tag="100" ind1=" " ind2=" ">
    <subfield code="a">AKANDWANAHO Amos</subfield>
  </datafield>
  <datafield tag="245" ind1=" " ind2=" ">
    <subfield code="a">Analyzing Institutional Challenges Leading to Project Delays: A Case  Study of Selected Organizations in  Rwanda</subfield>
  </datafield>
  <datafield tag="520" ind1=" " ind2=" ">
    <subfield code="a">Project delays continue to be a persistent challenge, impacting organizational effectiveness and
economic development. This study examines the institutional factors driving project delays across
various organizations in Kigali, Rwanda. The following specific objectives guided the research: to
identify institutional factors that contribute to time overruns in project implementation; to explore
how institutional challenges, such as financial limitations and poor planning, lead to cost overruns;
to assess how institutional inefficiencies affect the quality of project outcomes; and to propose
strategies to overcome institutional challenges and reduce project delays. The hypotheses were: H0
(null hypothesis): there is no significant relationship between institutional challenges and project
delays in selected organizations in Rwanda. H1 (alternative hypothesis): Institutional challenges
significantly contribute to project delays in selected organizations in Rwanda.
A descriptive cross-sectional research design was used to analyze data using SPSS. Data were
collected through a structured survey from a purposive sample of 51 project professionals and
project representatives. Respondents represented the private sector (56.86%), government
institutions (19.61%), NGOs (15.69%), international organizations (5.88%), and others (1.96%).
Most were male (68.63%) and aged 26&#x2013;35 (60.78%) with bachelor&#x2019;s degrees (60.78%).
Findings revealed that 53% of organizations experienced delays in fewer than 10% of projects,
while 37% faced delays in 10&#x2013;30% of projects. The primary causes included budget constraints
(28%), poor planning and scheduling (26%), and bureaucracy (22%). Key consequences were
missed business opportunities (34%), increased costs (28%), and loss of client trust (24%).
Multiple linear regression showed that institutional and managerial factors explained 14.84% of
the variance in project delays, with a p-value of 0.0584. The hybrid project management approach
was most used (39.22%), reflecting a need for adaptable frameworks.
The study recommended that institutions should carry out better planning (40%), improved
communication (22%), streamlined procedures (12%), and increased budgets (12%) to address
institutional delays.</subfield>
  </datafield>
  <datafield tag="653" ind1=" " ind2=" ">
    <subfield code="a">Undergraduate</subfield>
    <subfield code="a">PM </subfield>
    <subfield code="a">Program code BAPM,</subfield>
    <subfield code="a">Digital repository</subfield>
  </datafield>
  <datafield tag="856" ind1=" " ind2=" ">
    <subfield code="u">https://drive.google.com/file/d/16NqwDTrF_3x2-9wD7Q-JdUxvn_IVvrdh/view?usp=sharing</subfield>
    <subfield code="y">Click here </subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="2">ddc</subfield>
    <subfield code="c">CF</subfield>
    <subfield code="n">0</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">444</subfield>
    <subfield code="d">444</subfield>
  </datafield>
</record>