<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Analyzing Institutional Challenges Leading to Project Delays: A Case  Study of Selected Organizations in  Rwanda</title>
  </titleInfo>
  <name type="personal">
    <namePart>AKANDWANAHO Amos</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
  </physicalDescription>
  <abstract>Project delays continue to be a persistent challenge, impacting organizational effectiveness and
economic development. This study examines the institutional factors driving project delays across
various organizations in Kigali, Rwanda. The following specific objectives guided the research: to
identify institutional factors that contribute to time overruns in project implementation; to explore
how institutional challenges, such as financial limitations and poor planning, lead to cost overruns;
to assess how institutional inefficiencies affect the quality of project outcomes; and to propose
strategies to overcome institutional challenges and reduce project delays. The hypotheses were: H0
(null hypothesis): there is no significant relationship between institutional challenges and project
delays in selected organizations in Rwanda. H1 (alternative hypothesis): Institutional challenges
significantly contribute to project delays in selected organizations in Rwanda.
A descriptive cross-sectional research design was used to analyze data using SPSS. Data were
collected through a structured survey from a purposive sample of 51 project professionals and
project representatives. Respondents represented the private sector (56.86%), government
institutions (19.61%), NGOs (15.69%), international organizations (5.88%), and others (1.96%).
Most were male (68.63%) and aged 26–35 (60.78%) with bachelor’s degrees (60.78%).
Findings revealed that 53% of organizations experienced delays in fewer than 10% of projects,
while 37% faced delays in 10–30% of projects. The primary causes included budget constraints
(28%), poor planning and scheduling (26%), and bureaucracy (22%). Key consequences were
missed business opportunities (34%), increased costs (28%), and loss of client trust (24%).
Multiple linear regression showed that institutional and managerial factors explained 14.84% of
the variance in project delays, with a p-value of 0.0584. The hybrid project management approach
was most used (39.22%), reflecting a need for adaptable frameworks.
The study recommended that institutions should carry out better planning (40%), improved
communication (22%), streamlined procedures (12%), and increased budgets (12%) to address
institutional delays.</abstract>
  <subject>
    <topic>Undergraduate</topic>
    <topic>PM </topic>
    <topic>Program code BAPM,</topic>
    <topic>Digital repository</topic>
  </subject>
  <identifier type="uri">https://drive.google.com/file/d/16NqwDTrF_3x2-9wD7Q-JdUxvn_IVvrdh/view?usp=sharing</identifier>
  <location>
    <url displayLabel="Click here ">https://drive.google.com/file/d/16NqwDTrF_3x2-9wD7Q-JdUxvn_IVvrdh/view?usp=sharing</url>
  </location>
  <recordInfo>
    <recordContentSource authority="marcorg"/>
    <recordCreationDate encoding="marc">251023</recordCreationDate>
    <recordChangeDate encoding="iso8601">20251023121111.0</recordChangeDate>
  </recordInfo>
</mods>
